One week to go! Well, at least until my due date, but who knows when baby will really come out. In the meantime, I've been crafting.
Pattern: Trellis, Knitty Spring 2005
Yarn: Di Ve Zenith in dark brown, 2.5 balls from stash
Mods: I knit this pretty much according to the instructions. Back and fronts were knit separately, and then I joined the shoulders using a 3-needle bind off. Then, instead of knitting the sleeves separately, I picked up stitches evenly across the armhole opening and worked the sleeve from the top down. The cable pattern looks the same upside down as right side up, so this worked well. For baby knits, I will probably use this technique again. I did have to sew the side and sleeve seams. For the collar, I used short rows instead, which didn't produce the rolled collar that I hoped it would - I should have done more short rows - but it turned out just fine. I think baby might outgrow this before he/she gets to wear it anyway!
Last week on Etsy I saw some really cute wipes cases that had been covered and embellished with fabrics. I was tempted to buy a couple to match my Amy Butler Diaper Bag and Birdie Sling, but I decided to try to make them myself with my leftover fabric.
I picked up pink and blue plastic wipes case from Babies R Us for $2.49 a piece and cut out some leftover batting and fabric pieces to size (photos above are the top, and photo below is the bottom), plus a little extra to wrap around. I then picked up some trim on clearance from Joann's for $0.99/yard. I bought 2 yards for each case.
I pulled out the hot glue gun and attached the batting to the top and bottom, then cut it even with the edges. Then I glued the fabric to one side and pulled tight and glued to the other side. The short sides were glued similarly, and the corners were wrapped like you were wrapping a gift box. No need to worry about frayed edges - that's what the trim is for. Then I glued the trim all the way around to hide the edges and give it the finished look. Not bad for about $5 in supplies each and 30 minutes of sitting on the couch with a glue gun! These would be a fun addition to any baby shower gift.
Now that I'm 39 weeks, I'm ready for baby to come out. Anyone have suggestions for getting labor going? I haven't tried anything yet . . .
Showing posts with label Trellis. Show all posts
Showing posts with label Trellis. Show all posts
Tuesday, August 04, 2009
Monday, July 06, 2009
Baby countdown: 5 weeks to go!
With just 5 weeks left until baby's expected arrival, I am trying to keep my crafting goals realistic. I started Trellis on July 4 in some stashed di Ve Zenith in a chocolate brown. The last gender-neutral project! I've finished the back already, so this looks to be a quick little project. I've knit one before and the cable pattern is coming back to me.
We also (nearly) finished up the nursery this weekend! Here are some photos:
Wall colors are Crystal Aqua and Betsy's Linen, both by Valspar. We put up the chair rail ourselves, which was easier than I expected. Crib ordered online at Amazon (which always seems to win the online-price wars), chair we've had for several years, nightstand was painted and refinished - it was part of my mother's childhood bedroom set. Dinosaur prints were a find at Home Goods for $14.99 a piece!
Changing area: dresser from Ikea, outfitted with removable changing pad. Prints are by Yuko Lau, found unexpectedly at Target.
One of the wall shelves we put up: Peter Rabbit was a gift from a good friend, and the little antique plate was a shower gift from another good friend. Now, all we need is the baby!
We also (nearly) finished up the nursery this weekend! Here are some photos:
Wall colors are Crystal Aqua and Betsy's Linen, both by Valspar. We put up the chair rail ourselves, which was easier than I expected. Crib ordered online at Amazon (which always seems to win the online-price wars), chair we've had for several years, nightstand was painted and refinished - it was part of my mother's childhood bedroom set. Dinosaur prints were a find at Home Goods for $14.99 a piece!
Changing area: dresser from Ikea, outfitted with removable changing pad. Prints are by Yuko Lau, found unexpectedly at Target.
One of the wall shelves we put up: Peter Rabbit was a gift from a good friend, and the little antique plate was a shower gift from another good friend. Now, all we need is the baby!
Tuesday, September 25, 2007
FO: Trellis
Pattern: Trellis, from Spring 2005 Knitty.
Yarn: Elann Connemara in Wedgwood Blue, about 5 balls
Size: 6 months
Modifications Yarn: Elann Connemara in Wedgwood Blue, about 5 balls
Size: 6 months
Intentional: I knit the back and front pieces together to avoid a few extra seams to sew. I also picked up stitches around the collar and knit until it was about 7" long, then used a 3-needle bind off to make the hood.
Unintentional: I knit part of the cable incorrectly. The 4-st cable where it says to knit through the BACK loop and then knit 2 together through the back loop . . . yeah, I knit through the front and couldn't figure out why mine didn't look like everyone else's. Oops. Well, I decided that no one would know and who the heck cares.
Verdict: Very cute pattern. I think this one delivers a real bang for the amount of work involved. It looks really complicated but is actually rather straightforward. I will definitely be making this again (but with the right cable pattern!). I gave it to my friend at her shower on Sunday and it was well-received.
So, what's next? I've been in a slight knitting funk the past few weeks. I've been distracted by some home improvements (painting) and the sewing. Thanks for the comments on my Swing Bag; I've used it a lot have received compliments! I am taking a little break from sewing (long story, but I tried making a mini clutch out of the leftover fabric I had, and it was a disaster). But, I am thinking of making the clutch bag from Amy Butler's In Stitches. There are some nice FOs of it here and here.
I did finish the Irish Hiking Scarf, ordered more yarn to finish my Cable Down Raglan and am s l o w l y making progress on the garter stitch body of Bea. I am trying really hard not to start my next 2 real fall projects: Juno and Wicked. Must finish WIPs first. Can you believe it's almost October??
Unintentional: I knit part of the cable incorrectly. The 4-st cable where it says to knit through the BACK loop and then knit 2 together through the back loop . . . yeah, I knit through the front and couldn't figure out why mine didn't look like everyone else's. Oops. Well, I decided that no one would know and who the heck cares.
Verdict: Very cute pattern. I think this one delivers a real bang for the amount of work involved. It looks really complicated but is actually rather straightforward. I will definitely be making this again (but with the right cable pattern!). I gave it to my friend at her shower on Sunday and it was well-received.
So, what's next? I've been in a slight knitting funk the past few weeks. I've been distracted by some home improvements (painting) and the sewing. Thanks for the comments on my Swing Bag; I've used it a lot have received compliments! I am taking a little break from sewing (long story, but I tried making a mini clutch out of the leftover fabric I had, and it was a disaster). But, I am thinking of making the clutch bag from Amy Butler's In Stitches. There are some nice FOs of it here and here.
I did finish the Irish Hiking Scarf, ordered more yarn to finish my Cable Down Raglan and am s l o w l y making progress on the garter stitch body of Bea. I am trying really hard not to start my next 2 real fall projects: Juno and Wicked. Must finish WIPs first. Can you believe it's almost October??
Tuesday, September 11, 2007
Fall projects: What's OTN?
It seems that every month or so, I give you all an update on my current WIPs. There are few that I haven't blogged about, so I guess it's time for another edition of "What's OTN?"
The newest WIP is the Grannie Smith Cardigan, by neoknits. I started this last fall with some Kid Silk Haze and had a nightmare of a time keeping track of the stitch pattern. Since I loved working with the Baby Silk so much on my Mom's Sweater, I decided to get some before Elann ran out. I just started and am having a much better time keeping track of the lace pattern.
I also started the Irish Hiking Scarf, by Helloyarn. I bought 5 balls of Cashmerino Chunky earlier this year and used 2 to make a cabled hat. I planned on using the other 3 for a matching scarf and really liked this cable pattern, especially the garter edges. I've knit through 2 balls and it's about 1/2 as long as I'd like it. I only have 1 ball left, but thanks to Ravelry, languidly had 1 left in her stash that was the same dyelot that she wanted to sell. Score!
Cable Down Raglan: I don't knit with dpn's when I don't have to. I would rather seam a 20" long sleeve than knit it in the round. I decided to work the sleeves flat first and them come back and finish the body. I'm about 4" past the underarm, and I'm going to run out of yarn. Need to pick some up from WEBS asap!
Hooded Trellis: This is for a friend who is having a baby in December. She doesn't know the gender, but I showed her my copy of Special Knits for Babies by Debbie Bliss and she pointed to a hooded sweater. I had already started Trellis for her, but I decided to add a hood instead of knitting the collar. I think it came out OK, but I had to fold and sew down the sides, because I think baby might get suffocated otherwise. Yikes, we don't want that! I am thinking of adding a button to the top of the hood so she can fold it up and down. I'm worried a button on top of baby's head will look stupid, so we'll see!
You all met Bea in my last post, so no updates there. What fall projects have you all started or are thinking about?
I also started the Irish Hiking Scarf, by Helloyarn. I bought 5 balls of Cashmerino Chunky earlier this year and used 2 to make a cabled hat. I planned on using the other 3 for a matching scarf and really liked this cable pattern, especially the garter edges. I've knit through 2 balls and it's about 1/2 as long as I'd like it. I only have 1 ball left, but thanks to Ravelry, languidly had 1 left in her stash that was the same dyelot that she wanted to sell. Score!
Cable Down Raglan: I don't knit with dpn's when I don't have to. I would rather seam a 20" long sleeve than knit it in the round. I decided to work the sleeves flat first and them come back and finish the body. I'm about 4" past the underarm, and I'm going to run out of yarn. Need to pick some up from WEBS asap!
Hooded Trellis: This is for a friend who is having a baby in December. She doesn't know the gender, but I showed her my copy of Special Knits for Babies by Debbie Bliss and she pointed to a hooded sweater. I had already started Trellis for her, but I decided to add a hood instead of knitting the collar. I think it came out OK, but I had to fold and sew down the sides, because I think baby might get suffocated otherwise. Yikes, we don't want that! I am thinking of adding a button to the top of the hood so she can fold it up and down. I'm worried a button on top of baby's head will look stupid, so we'll see!
You all met Bea in my last post, so no updates there. What fall projects have you all started or are thinking about?
Wednesday, June 20, 2007
Blogiversary and WIP update
Here is a look at the knitting pile occupying me lately:
Something "Blushy", aka knit and tonic's Something Red. This is attempt #2 at making a pink cardigan with cables to give it a fitted look. It needs to be blocked, but I think it gets at what I was going for. Unfortunately, I ran out of yarn here - with about 1/3 of the sleeve to go. Order for 1 more ball has been made. This should be done next week.
Trellis, from Knitty. I'm not sure yet who this is for. I have 2 pregnant friends and depending on who has what (sex-wise), this may get done speedy or slowly.
My poor mother's lingering sweater. I know she won't wear this 'til fall, but I really need to get my act together and finish it! I've got the back and one sleeve done and just started the front.
Ms. Marigold. Ah, Ms. Marigold. Those who read last week's post might notice that she looks a little shorter. Hmm. Well, I was just about finished the bottom last night and decided to try it on. It was way too big! I ripped back to the armhole and am inserting decreases instead. I tried it on again and am glad to report it fits. Maybe this one will get done next week too.
Last, and yes, least, is the Cable Down Raglan. Why did I cast this on? I don't know. I've wanted to get it going for a while and think it will get good wear on cool nights and early fall. Isn't there enough in my WIP pile as it is, though? What was I thinking? Seriously.
And, this week is my approximate 1 year blogiversary. Thanks to those who read and/or comment. I think the feedback, advice and help we share in this community is just amazing. So, thanks!
Something "Blushy", aka knit and tonic's Something Red. This is attempt #2 at making a pink cardigan with cables to give it a fitted look. It needs to be blocked, but I think it gets at what I was going for. Unfortunately, I ran out of yarn here - with about 1/3 of the sleeve to go. Order for 1 more ball has been made. This should be done next week.
Trellis, from Knitty. I'm not sure yet who this is for. I have 2 pregnant friends and depending on who has what (sex-wise), this may get done speedy or slowly.
My poor mother's lingering sweater. I know she won't wear this 'til fall, but I really need to get my act together and finish it! I've got the back and one sleeve done and just started the front.
Ms. Marigold. Ah, Ms. Marigold. Those who read last week's post might notice that she looks a little shorter. Hmm. Well, I was just about finished the bottom last night and decided to try it on. It was way too big! I ripped back to the armhole and am inserting decreases instead. I tried it on again and am glad to report it fits. Maybe this one will get done next week too.
Last, and yes, least, is the Cable Down Raglan. Why did I cast this on? I don't know. I've wanted to get it going for a while and think it will get good wear on cool nights and early fall. Isn't there enough in my WIP pile as it is, though? What was I thinking? Seriously.
And, this week is my approximate 1 year blogiversary. Thanks to those who read and/or comment. I think the feedback, advice and help we share in this community is just amazing. So, thanks!
Subscribe to:
Posts (Atom)










